| 352855 |
352855-CONSTRUCCION INSTITUTO BASICO CASERIO NUEVO SAN CARLOS SENAHU, ALTA VERAPAZ |
Metro cuadrado |
431.00 |
1,700,000.00 |
0.00 |
0.00 |
| 301047 |
301047-CONSTRUCCION INSTITUTO BASICO CASERIO EL ARENAL CENTRO SENAHU, ALTA VERAPAZ |
Metro cuadrado |
755.00 |
10,000.00 |
0.00 |
0.00 |
| 352857 |
352857-CONSTRUCCION INSTITUTO BASICO CASERIO SEBACH SEPAMAC SENAHU, ALTA VERAPAZ |
Metro cuadrado |
431.00 |
1,700,000.00 |
0.00 |
0.00 |
| 352857 |
352857-CONSTRUCCION INSTITUTO BASICO CASERIO SEBACH SEPAMAC SENAHU, ALTA VERAPAZ |
Metro cuadrado |
971.00 |
1,000.00 |
0.00 |
0.00 |
| 67640 |
CONSTRUCCION DE INSTITUTO BASICO SANTO DOMINGO ACTELA |
Metro cuadrado |
177.00 |
8,264.26 |
0.00 |
0.00 |
| 109208 |
CONSTRUCCION INSTITUTO BASICO BARRIO SANTIAGUILA SENAHU A.V. |
Metro cuadrado |
177.00 |
105,715.33 |
0.00 |
0.00 |
| 352855 |
352855-CONSTRUCCION INSTITUTO BASICO CASERIO NUEVO SAN CARLOS SENAHU, ALTA VERAPAZ |
Metro cuadrado |
431.00 |
1,000.00 |
0.00 |
0.00 |
| 109047 |
CONSTRUCCION INSTITUTO BASICO COOPERATIVA CHIREAJ SENAHU A.V. |
Metro cuadrado |
177.00 |
29,346.43 |
0.00 |
0.00 |